Plumbing and Gas System Updates

In this project, we added several plumbing components and prepared the gas system for inspection. We installed two ice maker trims, a washer box trim, and two thumb caps for cleanup. Additionally, a 2" flat plug and a chrome plate were added for cleanup, along with a 4" plug for a test T. Two copper hose bib males were soldered, and two 2” traps were insulated. The gas test is now ready for inspection.